<Project Name> Activity Cost Estimate <Author> <Date> <Version>
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Table of Contents 1.0   Statement of Purpose The purpose of this document is to provide an estimate of how much it would cost to  complete   each   activity   in   the   work   breakdown   structure   of   <project   name>.   This  document contains (a) a list of the activities in the work breakdown structure (WBS) with  the activity number in the WBS, (b) the different types of resources needed, (c) the  resource units needed or the number of hours worked for each activity, (d) the cost of  the resource per unit or hour, (e) the cost of each resource for each activity, (f) the total  number of resource units needed or the number of hours worked, (g) the total costs for  the different resources, (h) the total costs for completing each activity, (i) any reserves  allowed, (j) a total cost for completing the project, and (k) any assumptions made.
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 2.0 Critical Assumptions and Constraints Any assumptions and constraints that have been made during the cost estimation process for &lt;project name&gt; must be specified here. 3.0 Cost Estimate WBS Item Number WBS Item Resource Type 1 &lt;Add columns as necessary&gt; Total &lt;Enter WBS item number here&gt; &lt;Enter WBS item here&gt; &lt;Enter number of units/hours needed&gt; &lt;Enter cost per units/ hours needed&gt; &lt;Enter resource cost for WBS item here&gt; &lt;Add total cost for WBS item here&gt; &lt;add rows as necessary&gt; Subtotal &lt;Enter total number of units/hours needed for resource here&gt; &lt;Enter total number of cost of resource here&gt; &lt;Enter total cost of project here&gt; Reserves &lt;Enter cost reserves here&gt; Total &lt;Enter sum of total cost and cost reserves here&gt;...
View Full Document

This note was uploaded on 11/02/2010 for the course BUSSINES 210 taught by Professor Ali during the Spring '09 term at United Arab Emirates University.

Page1 / 4

activity_cost_estimate - 2.0 Critical Assumptions and...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online