activity_duration_estimate - ...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
<Project Name> Activity Duration Estimate <Author> <Date> <Version>
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Table of Contents 1.0   Statement of Purpose The purpose of this document is to provide an estimate of how long it would take to  complete   each   activity   in   the   work   breakdown   structure   of   <project   name>.   This  document contains (a) a list of the activities in the work breakdown structure, (b) the  duration estimate for each activity, (c) an estimated  project  duration,  and  (g) any 
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

activity_duration_estimate - ...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online