closing_risks - 2.0 Criteria List for Closing Risks Risk...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
<Project Name> Closing Risks <Author> <Date> <Version>
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Table of Contents 1.0   Statement of Purpose The purpose of this document is to provide the criteria which need to be met for the  risks identified for <project name> to be considered closed. This document includes a  list of the identified risk along with the criteria that should be met for risk closure.
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 2.0 Criteria List for Closing Risks Risk Criteria &lt;Enter risk name here&gt; &lt;Enter criteria that should be met for risk closure here&gt; Technology risks The planned mitigation actions have been completed and the estimated risk exposure of probability times impact is less than 2. &lt;Add rows as necessary&gt;...
View Full Document

This note was uploaded on 11/02/2010 for the course BUSSINES 210 taught by Professor Ali during the Spring '09 term at United Arab Emirates University.

Page1 / 2

closing_risks - 2.0 Criteria List for Closing Risks Risk...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online