{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

risk_register - RiskRegister ...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
<Project Name> Risk Register <Author> <Date> <Version>
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Table of Contents 1.0   Statement of Purpose The purpose of this document is to document and track identified risks to ensure that  appropriate personnel are assigned and strategies are applied to address the risks.  This document contains (a) a description of the Project’s scope, (b) the risk rating  scheme for <project name>, (c) recommended response for each rating, and (d) the  register itself. 2.0   Project Scope <Describe <project name>’s scope here> 3.0   Risk Rating Scheme Consequences Likelihood Rating Consequence Rating Likelihood 1 Major A Will occur in most cases. 2 Moderate B Could occur at some time. 3 Minor C Could occur, but rarely. 4 Insignificant D May occur, but probably never will
Background image of page 2
Consequences 1 2 3 4 Likelihood A E E H M B E H M M C H M M L D M M L N Recommended Mitigation Actions Grade Description Mitigation Action E Extreme Risk
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.
  • Spring '09
  • ALI
  • UCI race classifications, Tour de Georgia, 4 m, Union Cycliste Internationale, mitigation actions, Project Project  Manager

{[ snackBarMessage ]}