risk_response_plan - <ProjectName> RiskResponsePlan...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
<Project Name> Risk Response Plan <Author> <Date> <Version>
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Table of Contents 1.0   Revision History Name Date Reason For Changes Version <author> initial draft 1.0 draft1 2.0   Statement of Purpose The purpose of this document is to describe the methods for responding to risks  identified for <project name>. This document includes (a) a list of the risks that need to  be considered during <project name> along with an identification ID and the category  the risk belongs to, (b) the roles and responsibilities of any risk owners, (c) the results of  risk analysis processes, (d) a detailed description of the risk response strategies, (e) an  acknowledgement of any risk residuals that are expected to remain after the strategies  have been applied, (f) a list of actions used to implement the risk response strategies,  (g) the schedule and budget information related to risk response, (h) any contingency  plans that is used for risk response, (i) the plan modification rules, and (j) a section for  approval signatures.
Background image of page 2
3.0   Risk List List and describe the possible risks that may need to be considered during <Project 
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 8

risk_response_plan - &lt;ProjectName&gt; RiskResponsePlan...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online