scope_management_plan - <ProjectName>...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
<Project Name> Scope Management Plan <Author> <Date> <Version>
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Table of Contents 1.0   Revision History Name Date Reason For Changes Version <author> initial draft 1.0 draft1 2.0   Statement of Purpose The purpose of this document is to document the processes that will be used to manage  <project name>’s scope. This document includes (a) a project overview, (b) the roles  and responsibilities of those responsible for managing project scope, (c) the project  requirements, (d) the project deliverables, (e) the project success criteria, (f) information  about the work breakdown structure development, (g) procedures for scope baselining,  (h) how scope documentation will be conducted (i) the scope change management  process, (j) the plan modification rules, and (k) a section for approval signatures.
Background image of page 2
3.0   Project Overview 3.1   Overview of the Organization Provide some information about <organization name>. Describe the strategic goals of  the <organization name> and how top management plans to achieve these goals. Next,  explain specifically how <project name> relates to these organizational goals. 3.2   Current Situation and Problem/Opportunity Statement The aim of this section is to clearly outline how the proposed project will benefit the  organization.   The   current   situation   in   <organization   name>   is   first   explained.   This  includes a detailed description of the relevant environmental conditions. Second, a  description of the business problem or opportunity is provided. This includes a detailed 
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/02/2010 for the course BUSSINES 210 taught by Professor Ali during the Spring '09 term at United Arab Emirates University.

Page1 / 8

scope_management_plan - &lt;ProjectName&gt;...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online