work_breakdown_structure - 1 Main Task 1 1.1 Sub-Task 1.2...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
<Project Name> Work Breakdown Structure <Author> <Date> <Version>
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Table of Contents 1.0   Statement of Purpose The purpose of this document is to provide a record of the different tasks that need to  be completed for <project name>. This document contains a list of these tasks arranged  in a hierarchical order.  2.0   Work Breakdown Structure
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1. Main Task 1 1.1. Sub-Task 1.2. Sub-Task 1.3. Sub-Task 1.3.1. Sub-Subtask 1.3.1.1. Sub-Sub-Subtask 1.3.1.2. Sub-Sub-Subtask 1.4. Sub-Task 1.5. Sub-Task 2. Main Task 2 2.1. Sub-Task 2.2. Sub-Task 2.3. Sub-Task 2.3.1. Sub-Subtask 2.3.2. Sub-Subtask 2.3.3. Sub-Subtask 3. <Add main tasks and sub-tasks as necessary.>...
View Full Document

{[ snackBarMessage ]}

Page1 / 3

work_breakdown_structure - 1 Main Task 1 1.1 Sub-Task 1.2...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online