math+hw - Name: Section Registered In: Math 125 Homework 3...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Name: Section Registered In: Math 125 Homework 3 Due Wednesday, March 7 1. An auto company manufactures cars, pickup trucks, and sport utility vehicles (SUVs). The parts for the body of each vehicle must be stamped out on a press, undercoated, then finish-painted. Suppose the press line can press 35 car bodies per day if just cars are being made (that is, it requires 1/35 of a day to press one car body), 28 truck bodies per day if just trucks are being made, and 24.5 SUV bodies per day if just SUVs are being made. The undercoating line could coat 40 car bodies per day if just cars were being made, 30 trucks per day if just trucks were being made, and 24 SUVs per day if just SUVs were being made. The paint line could paint 30 car bodies per day if just cars were being made, 40 trucks per day if just trucks were being made, and 40 SUVs per day if just SUVs were being made....
View Full Document

This note was uploaded on 11/14/2010 for the course CHEM 232435545 taught by Professor Aa during the Spring '10 term at University of Illinois, Urbana Champaign.

Page1 / 2

math+hw - Name: Section Registered In: Math 125 Homework 3...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online