Click to edit Master subtitle style  12/1/10 ISE 460  Fall 2010 Discussion 5
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
 12/1/10 The cash flows for a certain project are as follows: Find the equivalent annual worth for this project at and  Chapter 6 – Example 
Background image of page 2
 12/1/10 An industrial firm is considering purchasing  several programmable controllers and automating  the company’s manufacturing operations.  It is estimated that the equipment will initially cost  $100,000 and the labor to install it will cost $35,000.  A service contract to maintain the equipment will cost  $5,000 per year.  Trained service personnel will have to be hired at an  annual salary of $30,000.  Chapter 6 – Example 
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
 12/1/10 A corporate executive jet with a seating capacity  of 20 has the following cost factors: Chapter 6 – Example 
Background image of page 4
 12/1/10 The City of Prattsville is comparing two plans for supplying water to a newly 
Background image of page 5
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/30/2010 for the course ISE 460 taught by Professor Bottlik during the Spring '06 term at USC.

Page1 / 5

Discussion 5 - ISE460 Fall2010 Discussion5...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online