OLS 274 Quiz 6

OLS 274 Quiz 6 - Supervision Today Chapter 06(6th Ed Points...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Supervision Today Chapter 06 (6th Ed.) Points Possible 10 Points Earned 10 Points Missed 0 Points Ungraded 0 Score 100.0% Response: _ 1. A type of control that provides feedback after an activity is finished to prevent future deviations, is referred to as ___________________. A. Focus Control B. Corrective Control C. Concurrent Control D. Preventative Control Response: B Answer: B Points: 1 / 1 2. All of these are major cost categories EXCEPT? A. Direct Labor Costs B. Indirect Labor Costs C. Minimize Waste D. Maintenance Costs Response: C Answer: C Points: 1 / 1 3. (T/F) Variation in performance that can be expected in all activities is called range of variation. Response: TRUE Answer: TRUE Points: 1 / 1 4. _________________ is a type of control that takes place while an activity is in progress. A. Corrective Control B. Preventative Control C. Focus Control D. Concurrent Control Response: D Answer: D
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Supervision Today Chapter 06 (6th Ed.) Points: 1 / 1 5. ______________ is a system that ensures that
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 4

OLS 274 Quiz 6 - Supervision Today Chapter 06(6th Ed Points...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online