Digital phase 2 - EGR 3331 DR. Salih-ALJ Spring 2010 Phase...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
EGR 3331 DR. Salih-ALJ Spring 2010 Phase 1 of the project Due to: March 1 st , 2010 Practical Problem Project Phase 2 The team members : Team member : Major : Contact : Section : Asmae BERRADA Computer sciences a.berrada@aui.ma 02 Nissrine EL MARCHOUM Computer sciences n.elmarchoum@aui. ma 01 Soukayna MOUATADID Engineering and management sciences s.mouatadid@aui.m a 02 At this level of the project, we are presenting the truth table in order to make connection between our inputs and our outputs. The problem statement implies that we are going to deal with 4 inputs and 2 outputs. We’re also looking forward to explain two cases from our truth table. The inputs: A: SF: it’s 0 when the elevator is at the first floor and 1 when the elevator is at the second floor (indicated floor).
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
B: L1/Down: it takes 0 when not pushed and 1 when pushed. C: L2/Up: it takes 0 when not pushed and 1 when pushed. D:
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/03/2010 for the course SSE dig taught by Professor Dsidjs during the Spring '10 term at Mercer County Community College.

Page1 / 4

Digital phase 2 - EGR 3331 DR. Salih-ALJ Spring 2010 Phase...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online