IE 413 Assign 6

IE 413 Assign 6 - IE 413 Assignment 6 Jess McCall Ju Xiong...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: IE 413 Assignment 6 Jess McCall Ju Xiong I ntroduction: We model a small manufacturing system, which consists of four manufacturing cells. There are 3 different part types from customer 1: Part 1, 2 and 3. The inter- arrival time between successive part arrivals (all types combined) is exponentially distributed with a mean of 13 minutes: the first part arrives at time 0. The distribution by type is 25%, Part 1; 49%, Part 2; and 26% Part 3. For customer 2, there are two different part types that arrive from this customer: Part 4 and 5. The arrival process is in addition to and independent of the arrivals of parts from customer 1. The inter-arrival time between successive part arrivals (both types combined) is exponentially distributed with a mean of 15 minutes: the first part arrives at time 0. The distribution by type is 40%, Part 4; and 60% Part 5. Each part type visits a different sequence of stations (cells) and the part steps and process times are given. There are 4 cells in total. Cells 1, 2, and 4 each have a single machine. Cell 3 has two machines. The transfer time between arrival and the first machine....
View Full Document

Page1 / 6

IE 413 Assign 6 - IE 413 Assignment 6 Jess McCall Ju Xiong...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online