phase3_appendix

phase3_appendix - IE 341 Phase I I I Appendix C C1: MAX =...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: IE 341 Phase I I I Appendix C C1: MAX = 120000*P - 120*P*P-(((150+DS)*Q1+.1*Q1*Q1+150*D_Train+300*D_Truck)+ ((145+DS)*Q2+.08*Q2*Q2+275*S_Train+550*S_Truck)+((ex_rate*320+400)*Q3+ (ex_rate*.05)*Q3*Q3)+T*(320*Q3+.05*Q3*Q3)); ! S_Train = Sheldon_Train D_Train = Decorah_Train S_Truck = Sheldon_Truck D_Truck = Decorah_Truck; DS = 200; T = 0; !Exchange rate; ex_rate = .5; !Shipping Constraints; D_Truck + D_Train = Q1; S_Truck + S_Train =Q2; S_Train <= 1200; D_Train <= 800; !Demand Constraints; Q1+ Q2+ Q3 = D; 120000 - 120 * P = D; !Carbon Emmisions Constraints; 44 * S_Truck + 24 * D_Truck + 110 * S_Train + 150 * D_Train + 800 * Q3 = CF; CF >= 0; Q1 >= 0; Q2 >= 0; Q3 >= 0; S_Truck >= 0; D_Truck >= 0; S_Train >= 0; D_Train >= 0; P >= 0; C2: Local optimal solution found. Objective value: 1890918. Variable Value Reduced Cost P 930.8824 0.000000 DS 200.0000 0.000000 Q1 1058.824 0.000000 D_TRAIN 800.0000 0.000000 D_TRUCK 258.8235 0.000000 Q2 1200.000 0.000000 S_TRAIN 1200.000 0.000000 S_TRUCK 0.000000 0....
View Full Document

This note was uploaded on 12/06/2010 for the course IE 341 taught by Professor Min during the Fall '10 term at Iowa State.

Page1 / 4

phase3_appendix - IE 341 Phase I I I Appendix C C1: MAX =...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online