HW02_corrected-Sp10

HW02_corrected-Sp10 - MGMT36100:HW02 40Points...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
HW02 Sp10.docx Page 1 MGMT 36100: HW 02 40 Points Due: February 10, 2010 Show your calculations Submit one copy per group. Neatness is expected. Question 1(18 points – 3, 2, 4, 4 and 5): For the information shown, answer the following. ( Tiebreaker: The largest task number comes first .). (a) Develop the precedence diagram. Write tasks times next to each task. (b) Determine the target cycle time in seconds and the lower bound on number of stations needed for a desired output of at least 500 units in a 7 hour day. Cycle time should be in integer number of seconds. (c) Perform line balancing using the LPT method, calculate effective cycle time, line efficiency and show layout. Use appropriate tables. (d) Repeat part (c) using LPT method but with the condition that tasks 4 and 5 cannot be done in the same station (add appropriate tables). (e) Repeat line balancing using the RPW method and calculate line efficiency . Add a table showing task weights in addition to tables similar to those in part (c). Also write task weights besides task times in the
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/14/2010 for the course MGMT 361 taught by Professor Panwalker during the Spring '10 term at Purdue.

Ask a homework question - tutors are online