MM305_Unit6_Project

MM305_Unit6_Project - b What length of cable is required 2...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
MM305 Quantitative Analysis for Managers Unit 6 Project Please download this document to your computer and save it using the naming  convention specified in the course syllabus.  After completing and saving the project  problems, submit your project in the Drop Box for Unit 6. 1. Brantley College has decided to "wire" its campus. The first stage in this effort is to install the  "backbone," i.e., to connect all the buildings. The table below gives the distances between the  various buildings on campus in hundreds of feet. Distances in Hundreds of Feet From To Building 1 Building 2 Building 3 Building 4 Building 5 Building 6 Building 1 3 7 5 5 4 Building 2 5 2 6 6 Building 3 5 4 4 Building 4 5 3 Building 5 4 Building 6 a. How should the buildings be connected to minimize the total length of cable? 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: b. What length of cable is required? 2. The following represents the distances in miles from a warehouse (node 1) to various cities in Alabama. The major outlet store is located at node 7. Find the shortest route from Node 1 to Node 7. From Node To Node Distance 1 2 40 1 4 100 2 3 20 2 4 30 3 4 60 3 5 40 3 6 20 4 5 70 4 7 50 5 6 50 5 7 80 6 7 40 3. The network of storm drains and the capacities are shown below. Determine the maximum flow (in hundreds of gallons of water per minute) from node 1 to node 5. Remember that the arc has both capacity and reverse capacity. From Node To Node Fluid Flow 1 2 150 2 1 100 1 3 3 1 150 1 4 300 4 1 300 1 5 150 5 1 100 2 4 300 4 2 200 3 4 250 4 3 300 3 5 300 5 3 250 4 5 100 5 4...
View Full Document

This note was uploaded on 12/14/2010 for the course MM 305 taught by Professor Fulton during the Fall '09 term at Kaplan University.

Page1 / 2

MM305_Unit6_Project - b What length of cable is required 2...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online