6.) After completing the three different costing systems, we came to realize that the results reported as the same. However, we favor the ABC costing method to determine costs. After some analysis, we realized that under the activity based costing, it produces higher proportional
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: costs. Comparing this with the other two methods, there were differences in cost allocation with maintenance and engineering. 100% of the costs are allocated on a reasonable resource basis using the ABC method...