ch05 - Chapter5: ProjectScopeManagement

Info iconThis preview shows pages 1–7. Sign up to view the full content.

View Full Document Right Arrow Icon
Chapter 5:  Project Scope Management Information Technology Project Management, Fourth Edition
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2 Information Technology Project Management, Fourth Edition Project Scope Management Processes Scope planning : Deciding how the scope will be defined, verified, and controlled. Scope definition : Reviewing the project charter and preliminary scope statement and adding more information as requirements are developed and change requests are approved. Creating the WBS : Subdividing the major project deliverables into smaller, more manageable components. Scope verification : Formalizing acceptance of the project scope. Scope control : Controlling changes to project scope.
Background image of page 2
3 Information Technology Project Management, Fourth Edition Sample Project Charter
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
4 Information Technology Project Management, Fourth Edition Sample Project  Charter (cont’d)
Background image of page 4
5 Information Technology Project Management, Fourth Edition Sample Intranet WBS Organized by Phase
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
6 Information Technology Project Management, Fourth Edition Intranet WBS in Tabular Form 1.0 Concept 1.1 Evaluate current systems 1.2 Define requirements 1.2.1 Define user requirements 1.2.2 Define content requirements 1.2.3 Define system requirements 1.2.4 Define server owner requirements 1.3 Define specific functionality
Background image of page 6
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/17/2010 for the course TECHNOLOGY CSC420 taught by Professor Na during the Spring '10 term at Sullivan.

Page1 / 17

ch05 - Chapter5: ProjectScopeManagement

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online