OPMA 5364 old exam sample key

OPMA 5364 old exam sample key - (1 – 0.176 – 0.277 12...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Final Solutions to OPMA 5364 Old Exam Sample 8. a. A: $150,000; B: $120,000 b. A: 2.4; B: 1.5 c. A: $-11,286; B: $3,938 9. a. T(10) = 86.625 hours b. $133,389 for all 15 units; or $8,893 per unit c. $27,502 for 4 extra units; or $5,500 per unit d. 17 parts 10. Critical path = cedf = 20 example for h: duration=7, ES=11, EF=18, LS=13, LF=20, slack=2 11. Critical path = aeh = 15.833 Std. Dev. = 1.965 54.7% probability of finishing between 14.000 and 17.000 days
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: (1 – 0.176 – 0.277) 12. Crashing costs per day: 11, 10, 10, 5, --, 7, 18, 16 Project Duration Crash Activity Additional Cost New Critical Path 20----bdgh 19 d 5 bdgh 18 b 10 bdgh/adgh/cfh 17 h 16 bdgh/adgh/cfh 16 gf 25 bdgh/adgh/cfh 15 abf 28 bdgh/adgh/cfh $84 13. a. 8,900 b. 6,230 c. 5,340 d. 4,900 e. 440 f. -890 g. 1.09 h. 0.86 i. 3,266 j. 8,166...
View Full Document

This note was uploaded on 12/21/2010 for the course BUSA 5364 taught by Professor Greg during the Spring '08 term at UT Arlington.