ch2 - ch2 True/False Indicate whether the statement is true...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
ch2 True/False Indicate whether the statement is true or false. ____ 1. The first four major phases of the predictive systems development life cycle (SDLC) are the planning phase, the analysis phase, the design phase, and the prototyping phase. ____ 2. The primary objective of analysis activities is to understand the business needs and processing requirements of the new system. ____ 3. The support phase includes maintaining and enhancing the system. ____ 4. The first activity in the project planning phase is to develop the project schedule. ____ 5. The initial definition and scope of the business problem is one of the objectives of the analysis phase. ____ 6. Feasibility analysis investigates economic, organizational, technical, resource, and schedule feasibility. ____ 7. The support phase is the shortest and least expensive phase of the system development life cycle (SDLC). ____ 8. A tool is a software support that helps create models or other components required in the project. ____ 9. Every system must have sufficient controls to protect the integrity of the database and the application pro- gram. ____ 10. No system is successful unless the users understand it and can use it appropriately. ____ 11. Design activities are those that define the architecture and physical structure of a new system to satisfy the business's requirements. ____ 12. During the design phase, analysts begin to define a computer-system solution. ____ 13. Implementation is the actual construction, testing, and installation of a functioning information system. ____ 14. The most important activity of project planning is to define precisely the business problem and the scope of the required solution. ____ 15. The application is the portion of the new information system that satisfies the user’s needs in the problem do- main. ____ 16. A predictive SDLC has a high technical risk. ____ 17. A project cannot have both predictive and adaptive elements. ____ 18. Iteration assumes that no one gets the right result the first time. ____ 19. The UP is an example of an SDLC that is in the middle of the predictive versus adaptive scale. ____ 20. The spiral model is generally considered to be the first adaptive approach to system development. ____ 21. A methodolgy contains guidelines to follow for completing every activity in the systems development life cycle. ____ 22. A project management software application is an example of a tool. ____ 23. Structured programmming and top-down programming are identical concepts. ____ 24. The data flow diagram is used with the structured analysis system development technique. ____ 25. The class diagram is used with the Information Engineering system development approach.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
____ 26. Exteme Programming (XP) is a methodolgy that is iterative and adaptive and begins with users describing re- quirements as user stories. ____ 27.
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/29/2010 for the course FCIT 200 taught by Professor Dr.adam during the Spring '10 term at Katholieke Universiteit Leuven.

Page1 / 10

ch2 - ch2 True/False Indicate whether the statement is true...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online