Sample Project Risk Management Plan

Sample Project Risk Management Plan - Appendix C Risk...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Appendix C Risk Management Plan for The BNL Center for Functional Nanomaterials At Brookhaven National Laboratory Upton, New York 11973 May, 2004 Risk Management Plan for The BNL Center for Functional Nanomaterials Approved by: __________________________________ Robert Hwang CFN Director Brookhaven National Laboratory __________________________________ Michael Schaeffer CFN Project Manager Brookhaven National Laboratory Table of Contents 1.0 Introduction ................................................................................................................. 1 2.0 Project Description ...................................................................................................... 1 3.0 Risk Assessment Methodology ................................................................................... 2 4.0 Risk Reporting, Tracking, and Closeout ..................................................................... 2 5.0 Criteria for Risk Identification and Assessment.......................................................... 3 6.0 Assessment Results ..................................................................................................... 4 7.0 Contingency Risk ...................................................................................................... 20 8.0 Risk Factors and Weight Table ................................................................................. 21 9.0 Risk Factors & Cost Weighting Description for CFN Contingency Risk Analysis . 22 10.0 Contingency Table..................................................................................................... 23 Attachment A – CFN Risk Management Team Attachment B – Risk Assessment Summary and Tracking Table 1 Risk Management Plan for The BNL Center for Functional Nanomaterials 1.0 INTRODUCTION Risks anticipated for the Brookhaven National Laboratory (BNL) Center for Functional Nanomaterials (CFN) project will be managed using a tailored approach in accordance with the methodology identified in the DOE M 413.3-1, Project Management for the Acquisition of Capital Assets. The CFN Risk Management Plan (RMP) identifies the scope of the project’s risk definition and delineates the methodology that has been used to identify, quantify, and assess risks. The level of treatment is graded based on the level of risk determined. The RMP identifies the controls and processes used to identify and mitigate areas of cost, scope, schedule, and technical risk that may occur during project planning and implementation. The RMP will be maintained and updated throughout the life of the project. 2.0 PROJECT DESCRIPTION The project scope includes the design and construction of a laboratory building and the acquisition of the requisite instrumentation to support the targeted nanoscience thrust areas and laboratory functions....
View Full Document

This note was uploaded on 01/05/2011 for the course IE IE377 taught by Professor Hani during the Spring '10 term at German University in Cairo.

Page1 / 33

Sample Project Risk Management Plan - Appendix C Risk...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online