cjs250_appendix_c - ese can be controlled at the same time...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
hese can be controlled at the same time and cost. Axia College Material Appendix C Risk Management Options Part I: Scenario and Identification A retail chain has asked an outside security consulting team to perform a threat and risk assessment for one of its branches. The consulting team has identified the following threats and accompanying risk levels for this particular store: 1. Fire (medium) 2. Internal theft (high) 3. Shoplifting (medium) 4. Burglary (high) 5. Bomb (low) The retail chain has decided to respond to these threats in the following manner: For threat #1 , management has decided to take no further precautions because the store is currently up to code and the insurance policy the company carries fully covers it in the event of fire. For threat #2 , management has decided to implement background checks for all new applicants and all employees must now have their bags and backpacks checked by security before exiting the store. For threat #3 , management has decided to add no additional security measures. Losses due to shoplifting are expected and have been included in the store’s budget. For
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/08/2011 for the course CJS 210 CJS 210 taught by Professor Garner during the Spring '10 term at University of Phoenix.

Page1 / 3

cjs250_appendix_c - ese can be controlled at the same time...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online