11 Steps of Automation Project

11 Steps of Automation Project - Explanation of Steps

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
Explanation of Steps http://www.matrixautomation.com/approach/appexpl.htm 1 of 12 12/13/2006 3:33 PM top Founded by Allen-Bradley, this project methodology is a process that is designed to ensure customer satisfaction. Matrix Automation is a Rockwell Automation/Allen-Bradley authorized system integrator. Step 1 AUTOMATION PLAN Step 2 PROJECT KICK-OFF MEETING Step 3 FIELD SURVEY Step 4 FUNCTIONAL DESCRIPTION Step 5 DETAILED DESCRIPTION Step 6 Step 7 SYSTEM DEVELOPMENT Step 8 SYSTEM INTEGRATION TASK Step 9 FACTORY ACCEPTANCE TEST Step 10 SUPPORT SERVICES Step 11 DOCUMENTATION Automation Plan Phase 1: Automation Plan Existing system operating procedures Highest potential automation areas Hardware/software block diagrams Field Hardware and sensor requirements Operational documents requirements System implementation plan and schedule System development, integration, assembly and testing requirements
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Explanation of Steps http://www.matrixautomation.com/approach/appexpl.htm 2 of 12 12/13/2006 3:33 PM Phased pricing summary Return on investment analysis Return to Approach Overview Back to top PROJECT KICK-OFF MEETING Phase 2: Project Kick-Off Meeting Review scope of work and clarity integrator and client responsibilities Establish a mail and transmittal system Set up a drawing list Obtain a set of safety requirements Obtain reference drawings and data Establish project reporting methods Introduce key integrator and client personnel with overall project responsibilities Develop a preliminary outline for format of final report Establish deliverables (Also, weekly project meetings attended by all system integrator personnel on project and monthly status review meetings.) Return to Approach Overview Back to top
Background image of page 2
Explanation of Steps http://www.matrixautomation.com/approach/appexpl.htm 3 of 12 12/13/2006 3:33 PM FIELD SURVEY Phase 3: Field Survey Integrator project team reviews current system, including: Physical layout Screen and report requirements Man machine interface Sequence of operation Current process overview Return to Approach Overview Back to top FUNCTIONAL DESCRIPTION
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Explanation of Steps http://www.matrixautomation.com/approach/appexpl.htm 4 of 12 12/13/2006 3:33 PM Phase 4: Functional Description (States functional requirements for project.) Reference request for proposal Involves customer input Upon final client approval is basis for design document I/O list Machine identifier 1. Rack identifier
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/11/2011 for the course BUSINESS ACC9 taught by Professor Yeetan during the Spring '10 term at Sunway University College.

Page1 / 12

11 Steps of Automation Project - Explanation of Steps

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online