10104026 - Page 1 of I ten?" 608815 2. To:...

Info iconThis preview shows pages 1–23. Sign up to view the full content.

View Full Document Right Arrow Icon
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 6
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 8
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 10
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 12
Background image of page 13

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 14
Background image of page 15

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 16
Background image of page 17

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 18
Background image of page 19

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 20
Background image of page 21

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 22
Background image of page 23
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Page 1 of I ten?" 608815 2. To: (Receiving Organization) 3. From: (Originating Organization) See Distribution List En-ineerin- Services NA 7 241-SY—101 M. J. Ostrom ’ , NA 8. Originator Remarks: a See attached Factory Acceptance Test Procedure for the NA . Westinghouse 100 Ton Hydrauiic Traiier. 1o_ systewmgflacmty: NA ' NA 14. Required Response Date: ASAP 11. Receiver Remarks: DATA TRANSMITTED (F) (C) (D) Sheet Rev. (E) Title or Description of Data Transmitted Factory Acceptance Test Procedure Westinghouse 100 Ton H drauiic Traiier. (U) n -. Impact Level (F) Reason for Transmittal (G) Disposition (H) & (I) « 1, 2, 3, or 4 (see 1. Approval 4. Review. 1. Approved 4. Reviewed no/comment' MRP 5.43) 2. Release 5. Post-Review 2. Approved w/comment 5. Reviewed wlcomrnent 3. Information 6. Dist. (Receipt Acknow. Required) 3. Disapproved w/comment 6. Receipt acknowledged (H, 17. SlGNATURE/DISTRIBUTION (See Impact Level for required signatures) (J) Name V (K) Signature (L) Date (M) MSIN (J) Name (K) Signature (L) Date (M) MSlN Cog.Eng. MJ Ostrom See ATP Coversheet H5-68 Cog.Mgr. CE Hanson See ATP Coversheet ((5-09 011 ML McElroy See ATP Coversheet 31-57 7 Safety LS Krogsrud See ATP Coversheet R3-D8 Proj/Prog. I ~ » Other 16 Mackey See ATP Coversheet 52-03 Rea- son 10 HIIHHE ‘ n i (\ p i Q (LEM .. 15 I.) e BM Koons See ATP Coversheet 33-08 7 . . (I 21. DOE APPROVAL (If requ1red) 7’, r Ltr. No. CE Hanson [1 Approved __.__.__.._ _________ [1 Approved u/com‘nents Signature of EDT Authorized Representative Cognizant/Project Date E] Di sapproved w/con'rnents Originator for Receiving Organization Engineer's Manager . a 39-7400-172-2 (07/91) GEFO97 Q g f‘ “if n! O S ‘ BD-7400-‘l72-1 (07/91) DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. RELEASE AUTHORIZATION Document Number: wHC-SD-WM-ATP-llz, Rev. 0' ' Factory AcceptanCe Test Procedure Westinghouse 100 D . : , . °°ument T'fle Ton Hydrauiic Trailer Release Date: 11/16/94 This document was reviewed following the procedures described in WHC-CM-3-4 and is: APPROVED FOR PUBLIC RELEASE WHC information Release Administration Specialist: . W A 11/16/94 _ , v ' _ ‘ . L. Birkl and TRADEMARK DISCLAIMER. Reference herein to any specific counercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors. This report has been reproduced from the best available copy. Available in paper copy and microfiche. :rinted in the United States of America. Available to the U.S. Department of Energy and its contractors rom: - U.S. Department of Energy Office of Scientific and Technical Information (DST!) P.O. Box 62 Oak Ridge, TN 37831 Telephone: (615) 576-8401 Available to the public from: U.S. Department of Commerce National Technical Information Service (NTIS) 5285 Port Royal Road Springfield, VA 22161 V Telephone: (703) 487-4650 A-6001-400.2 (09/94) UEFZSb SUPPORTING DOCUMENT . . 2. Title Ton Hydraulic Trailer 5 . Key Nerds FAT Acceptance Test Hydraulic Trailer KAMP lOl—SY D380/NBBZK 7. Abstract This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101—SY pump. [HSCIAHLJER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsi- bility for the aCcuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recom- ’ mendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. RELEASE STAMP p } OFFECiAL ELEASE ; WHC: ! N W A-6400-D73 (08/94) wer124 _ FACTORY ACCEPTANCE TEST PROCEDURE WHC-SD-NM-ATPJIZ FAQTQRY AQQEPTANQE TE§T PRQQEDQRE WESTINGHQUSE 100 TON HYDRAULIQ TRAILER Submitted by KAMP Systems P.0. Box 3243 Ontario, CA 91761 Nov 8, 1994 APPROVALS: , //-/?‘9;‘ 'waas gmsWoé/Q /I—/Y-2y er Date Wnag Date ( , ' // IV/é‘b/ //"/Z'7/"/ MP Systems M. cCuHough / ' Executive Officer Pr .dent Date Executive Officer, Controner Date 3 . Q46me O I T.» C. Mackex Hibl’g‘f’ J, J, 515k 1 //-/5"74. g1? ERS Engineer Date lOlSY ERS ineer Date //-/4« , 9y Ind. Review ‘A ’ ‘ “bylaw lOlSY Engineer ' Date Engineer Date M. J. Ostrom “46.4% C. E. Hanson : “x "Ar/54’ lOlSY ERS Project Engineer Date lOlSY Project Manager Date 97% MZWW’ [W H ,5 M. L. McEiro ups 114534- {5. Krogsrud ' I fly lOlSY DA V Date lOlSY Safety Date 1 MASTER msmsunow OF THiS DOCUMENT ls UNI-Wm"?D 15” FACTORY ACCEPTANCE TEST PROCEDURE I WHC—SD-WM-ATP-IIZ 11/08/94 PREFACE ' The objective of this acceptance test procedure is to verify that the Westinghouse Hydraulic Trailer meets the WHC-S-0280 Rev. 1, specification(s). The test director may modify this test procedure during testing as he deems necessary. although all modifications must be approved by Westinghouse representatives. WARNING: All signature lines and/or (LC. approvals must be signed or stamped in sequence as this document is written. Any out of sequence steps could cause damage to equipment, or possible harm to personnel. If any safety concerns arise during testing, testing may be halted. If testing is halted at any point in testing, return the trailer to a safe and stable condition. When testing is to commence again, perform the necessary steps to prepare the trailer for testing. A safe and stable condition_is defined as: Container and strongback lowered to the horizontal position, the hydraulics and systems OFF, and electrical power OFF. The outriggers may be left deployed or retracted as determined by the test director. _FACTORY ACCEPTANCE TEST PROCEDURE ' WHC-SD-WM-ATP—llZ 11/08/94 SECTION, 1.0 REVISION RECORD AND DISCREPANCY SHEET 1.1 FACTORY ACCEPTANCE TEST PROCEDURE WHC-SD-WM-ATP-llz 11/08/94 SECTION 2.0 REFERENCE DOCUMENTS AND W 2.1 DRAWINGSlDOCUMENTS _ KAMP Systems dwgs.«KSI 5000694 an sheets REMCO dwgs. (as provided) HHC—SD-WH—DA-HO, Bo'lting Seguen’ce for Attaching the Container to the Strong-Back for 241$Y101 HHC dwg . H-2-83743 FACTORY ACCEPTANCE TEST PROCEDURE NHC—SD-NM-ATP-IIZ 11/08/94 2.2 SUPPORT EQUIPMENT 2.2.1 VOM MODEL: 2.2.2 (1) 10-12" SCALE MODEL: 2.2.3 STOP WATCH MODEL: 2.2.4 ELECTRICAL VOLT METER MODEL: 2.2.5 LASER/THEODOLYTE MODEL: 2.2.6 (2) BI-FILAR TARGETS MODEL: 2.2.7 OPTICAL LEVEL MODEL: 2.2.8 STAND FOR OPTICAL LEVEL 2.2.9 AUXILIARY WEIGHT 19,140#(NHC PROVIDED) 2.2.10 100 FT. TAPE MEASURE 2.2.11 STEP LADDER 2.3 DEFINITIONS TraiTer primary pump is referred to as Pump #1.7 TraiIer mounted back-up pump is referred to as Pump #2. FACTORY ACCEPTANCE TEST PROCEDURE WHC—SD-WM-ATP—IIZ 11/08/94 SECTION 3.0 SAFETY CHECK AND SAFETY PRQCEDURES 3.1 Inspect trailer, strongback and container tube for loose fasteners, missing parts, loose hand tools, etc., and remove all foreign objects that could fall or obstruct test movements. 3.2 Clear personnel from immediate test area. 3.3 This test shall be performed in compliance with all vendor, state, and federal safety requirements and required personal protective equipment will be worn by all personnel participating in this test and within the perimeter of the test operation, as directed by safety monitor. 3.4 Prior to testing, verify that new 2 1/2“ QiA325,bolts and 1"£§ A325 bolts for the container/strong-back attachment are installed in accordance with WHC-SD-WM—DA—170 bolting procedure. ' 3.5 Verification that safety criteria above has been met. gTEST DIRECTOR: Signature Date SAFETY MONITOR: Signature Date FACTORY ACCEPTANCE TEST PROCEDURE 4.1 4.2 4.3 V 4.4 4.5 _ the NEMA 4X box mounted by the main control panel. WHC-SD-WM—ATP-IIZ 11/08/94 SECTION 4.0 PRE-OPERATION CHECK OUT Record the AC voTtage availabie at the main circuit breaker inside Verify manua] 480V AC 3 Phase Switch is in the OFF position. Verify a11 primary ‘ circuit breakers are in the OFF positions. Voitage: Q.C.: Verify fluid ievei in Res. Q.C.: Verify Spirit Levels are attached toQtEaiTer. Verify safety verification step 3.5 has been signed OFF by both test director and safety monitor. Q.C.: Verify that ail pivot points on the cyiinder are adequateTy Tubricated. Q.C.: FACTORY ACCEPTANCE TEST PROCEDURE 5.] 5.2 5.10 NHC—SD—WM—ATP—IIZ 11/08/94 SECTION 5.0 START UP Verify all primary and secondary disconnects are in OFF pasition. Q.C.: Connect 480V AC Power Cable to receptacle located adjacent to the manual ON/OFF power switch enclosure. Q.C.: Uncoil remote control pendant — verify 100 ft. length and connect to the fixed mounted electrical control console receptacle. Q.C.: Place primary electrical circuit breakers in the "ON position. Verify proper voltages at the control panel electrical bus within the NEMA 4X enclosure. Q.C.: Bump Hydraulic Pump #2, by pressing the Pump #2 Motor Start Button located on the main control panel and immediately pressing the red Motor Stop button. Verify that pump #2 rotates in the proper - direction. Q.C.: Energize Hydraulic Pump #2, by pressing the Pump #2 Motor Start Button located on the main control panel. Verify Pump #Z'Panel Indicator light is "ON". Q.C.: Inspect Pump #2 Hydraulic Circuit for leakage and verify no observable leakage. Note: any leakage in section 1.0. ‘Q.C.: Depress Pump #2 Motor Stop Button and verify Pump #2 Panel Indicator Light is OFF and motor has stopped running. Q.C.: Bump Hydraulic Pump #1, by pressing the Pump #1 Motor Start Button located on the remote control pendant and immediately pressing the red Motor Stop button. Verify that pump #1 rotates in the proper direction. \ Q.C.: Using the Remote Control Pendant, press Pump #1 Motor Start Button. Verify Pump Indicator Light is "ON" at the pendant control. Q.C.: Verify Pump #1 is running. Q.C.: FACTORY ACCEPTANCE TEST PROCEDURE 5.11 5.12 . 5.13 WHC—SD-WM4ATP—112 _ 11/08/94 Depress Pump #1 Motor ControI Stop Button on the Remote ControI Pendant. Verify Pump Indicator Light is OFF at the pendant controi. Q.C.: Verify pump #1 has stopped running. Q.C.: Using the Remote ControI Pendant, press Pump #2 Motor Start Button. 'Verify.Pump Indicator Light is "ON" at the pendant control. v . Q.C.: Verify Pump #2 is running; Q.C.: Depress Pump #2 Motor ControI Stop Button on the Remote Control Pendant. Verify Pump Indicator Light is OFF at the pendant. ' Q.C.: Verify Pump #2 has stopped running. Q.C.: FACTORY ACCEPTANCE TEST PROCEDURE 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 WHC-SD—WM-ATP—IIZ 11/08/94 SECTION. 6.0 LEVELING TRAILER Prior to deployment of outriggers, clear personnel, debris and articles from areas of outrigger path. _ Q.C.: Energize Hydraulic Pump #2 at the main control panel and verify Panel Indicator Light is "ON" and Pump #2 is running. Q.C.: Actuate the Outrigger Deploy valve at the main control panel to deploy the outriggers. Verify outriggers move smoothly to their fully extended positions. Q.C.: Record system pressure by actuating the Outrigger Deploy valve at the main control panel and reading the pressure gage inboard and to the rear of the main control panel. PRESSURE: Q.C.: Verify the system pressure is set at or below 2700 psi. Q.C.: Actuate the Outrigger Deploy valve at the main control panel to retract the outriggers. Verify outriggers move smoothly to their fully retracted positions. Q.C.: Deploy the outriggers once again and leave all outriggers in their extended positions ready for the leveling cylinder testing. v Q.C.: Outrigger Valves #1 through #4. “Use CAUTION in this operation as un-wanted and un—necessar loadin of trailer could occur“. Once Sand Shoe has engaged to the ground, only lift the trailer an inch or two before retracting to full up position. Verify valve movement corresponds to outrigger leveling cylinder movement. #1 ‘ EXTEND - Outrigger Q.C RETRACT " Q.C #2 EXTEND " Q.C ‘ RETRACT “ Q.C #3 EXTEND " Q.C RETRACT ." Q.C #4 ‘EXTEND " Q.C RETRACT V " Q.C Position (1) scale on the trailer sequentially at designated locations. Position surveying device to shoot all positions. Q.C.: I 10 FACTORY ACCEPTANCE TEST PROCEDURE 6.9 76.10 6.11 6.12 6.13 rground by actuating landing gear valves 1 and 2. WHC-SD—WM-ATP-IIZ 11/08/94 Extend the outrigger cylinders as directed by the trailer manufacturer. Position trailer into a level plane with tires OFF the ground by use of outrigger cylinders and fixed spirit levels. Verify that the designated points are within 0.5 inch elevation with the transit. Height Cyl. From Ref. #1 #2 #3 #4 . Q.C.: Trailer level within 0.5 inches Q.C.: Record spirit level tolerance required to maintain 0.5 inch level of trailer deck. Spirit Level Tolerance: Verify spirit levels are set and spirit level tolerance is correct. Q.C.: Extend landing gear until the sand shoes make contact with the Check spirit levels to verify the trailer is level when landing gear are extended. Q.C.: Stop pump #2. Q.C.: 11 FACTORY ACCEPTANCE TEST PROCEDURE 7.1 7.2 7.3 WHC-SD—WM-ATP-IIZ 11/08/94 SECTION 7.0 FUNCTIONALZPROOFLOAD TEST The Functional/Proofload test of the Main Hydraulic Cylinder will be performed in the loaded condition with container mounted onto the strongback, as called out in section 3.5, and test weight attached in accordance with drawing #H-2—83743 In preparation for this test, verify the following: 7.2.1 Start pump #1 using remote control pendent. Verify pump #1 is running. Q.C.: 7.2.3 The outriggers are all in their extended positions. Q.C.: 7.2.4 The Leveling Cylinder Sand Shoes are in contact with the ground and trailer is level as called out in section 6. ’ Q.C.:' _ ' 7.2.5 Personnel are cleared from immediate area. » Q.C.: 7.2.6 All tools and/or loose objects have been removed from strongback and container. Q.C.: 7.2.7 Verify container and test weight are attached properly and all hardware is secure. Q.C.: 7.2.8 Record both the.ambient temperature and the temperature of the hydraulic fluid. ~ Ambient temp: Fluid temp: Q.C.: FunCtional testing of the Main Hydraulic Cylinder may now commence using the remote control pendent. Actuate extend cylinder, and raise the strongback approximately (12) inches from its support and stop by depressing the limit switch. Verify the operation of the limit switch. Release the extend cylinder and hold the strongback in this position for a period of (5) minutes. Verify no observable cylinder drift. Return to the horizontal position and verify smooth return and proper positioning/alignment at support points. Q.C.: TIME: Q.C.: 12 FACTORY ACCEPTANCE TEST PROCEDURE 7.4 7.5 7.6 7.7 WHC—SD—WM-ATP-IIZ 11/08/94 Actuate extend cylinder, and raise the strongback to the 90 degree position (vertical) and record the total elapsed time. TIME: Q.C.: After at least 5 minutes, verify stability of system. TIME: Q.C.: Also verify the following: 7.4.1 Smooth operation and proper sequence of the Main Hydraulic Cylinder without any sticking, bumping, jumping, or unplanned starts or stops, through entire travel. Q.C.: 7.4.2 Counterbalance valves operate properly such that there is a smooth transition when strongback and container center of gravity passes through vertical. 7 ‘ Q.C.: 7.4.3 Verify that the main telescoping cylinder shuts OFF automatically when the container reaches the 90° position. ' ,Q.C.: ' Record fluid temperature. Actuate Retract Cylinder, allowing strongback to lower and container to nest into cradle supports. Record total elapsed time. Verify container interface to cradle support seats properly. TEMP: Q.C.: TIME: Q.C.: 7.5.1 Verify smooth operation of the Main Hydraulic Cylinder without any sticking, bumping, jumping, or unplanned starts or stops, through entire travel. . Q.C.: Attach (2) Bi—Filar targets to the strongback positioned to allow vertical measurements of the strongback. Verify targets are attached. 5 - Q.C.: Once again record the fluid temperature and raise the strongback and container to the full vertical position. Record elapsed times. ' TEMP: TIME: Q.C.: Q.C.: FACTORY ACCEPTANCE TEST PROCEDURE 7.3_ 7.9 7.10 7.11 7.12 7.13. 7.14 NHC-SD—WM-ATP-IIZ 11/08/94 By use of Laser and targets, measure plumbness of the strongback. ReCord port side target positions. FORWARD/AFT DIM: INBOARD/OUTBOARD DIM: Do on Record starboard side target positions. FORWARD/AFT DIM: . Q.C.: INBOARD/OUTBOARD DIM: Q.C.: Verify that a minimum vertical position of 90 degrees vertical is achievable. Q.C.: HOLD STRONGBACK IN THIS VERTICAL POSITION FOR A MINIMUM OF FIFTEEN MINUTES. ‘ Re-measure strongback for target-positions. Record port side target positions. FORWARD/AFT DIM: Q.C.: INBOARD/OUTBOARD DIM: Q.C.: Record starboard side target positions. FORWARD/AFT DIM: Q.C.: INBOARD/OUTBOARD DIM: Q.C.: Record fluid temperature and return strongback to the horizontal position. Record elapsed time. Verify a smooth transition as strongback and container center of gravity passes through vertical. ' TEMP: TIME: Q.C.: Q.C.: Verify trailer stability has been maintained throughout this entire functional test cycle and that no drift has occurred between steps # 7.8 and 7.9. Q.C.: Verify strongback and container returns smoothly to the horizontal position and seats properly at the cradle supports. Q.C.: At remote pendent control, Switch Pump #1 to the OFF position. Verify light out and pump stopped. . Q.C.: »At the Remote Pendent Control Panel, switch Pump #2 to the "ON" position. Verify light "ON" and Pump #2 running. Q.C.. 14. FACTORY ACCEPTANCE TEST PROCEDURE 7.15 7.16 7.17 7.18 7.19 7.20 WHC-SD-WM-ATP—llZ 11/08/94 Record fluid temperature. Actuate Extend Cylinder and raise the strongback and container to the full vertical position. Record elapsed times. ' TEMP: TIME: Q.C.: Q.C.: [Record fluid temperature. Actuate Retract Cylinder to return the strongback and container to the horizontal position. Record elapsed times. ' TEMP: Q.C.: Q.C.: TIME: During the test cycling, observe for any of the following: ‘0 Smooth transition from horizontal to vertical. 0 Smooth transition from vertical to horizontal. - Container returns smoothly to horizontal cradle position. Any unplanned starts and/or stops through entire travel cycle. Record any observed discrepancies in Section 1.0. Q.C.: With strongback and container in their horizontal positions, switch the power OFF to Pump #2. Verify light out and pump stopped. ' Q.C.: By use of the Remote Control Pendent start up Pump #1 and lift the strongback and container to a position approximately half way between horizontal and vertical position.» At the half way position stop Pump #1, wait a minimum of three (3) minutes and turn on pump #2 using the pendant. Resume lift to vertical position using Pump #2 and Remote Control Pendant. Verify smooth operation throughout this step. Q.C.: After reaching the vertical position switch pump #2 OFF. Verify pump #2 off. Q.C.: Start Pump #1 and lower strongback and container to approximately half way between horizontal and vertical position. Stop Pump #1, wait a minimum of three (3) minutes and turn on Pump #2. Resume lowering to horizontal position. Verify smooth operation throughout this step. . Q.C.: This completes the functional testing of the Main Hydraulic Cylinder System. 15 FACTORY ACCEPTANCE TEST PROCEDURE WHC-SD-WM—ATP-IIZ 1 11/08/94 SECTION 8.0 PROOFLOAD TESTING 8.1 By performing Section 7.0, .the Proofload test-has been accomplished. Q.C. verify Section 7.0 has been performed. Q.C.: 8.2 Visually inspect all primary load carrying members on the container, strongback, and hydraulic trailer for” cracked welds or any other signs of structural damage. Q.C.: 8.3 Perform MT Testing of designated welds. Q.C.: k8.4 Visually inspect all hydraulic system lines and components and verify that no fluid leakage occurred during testing. ' Q.C.: 16 FACTORY ACCEPTANCE TEST PROCEDURE 9.1 9.2 9.3 9.4 9.5 9.6 WHC—SD-WM-ATP—llZ 11/08/94 SECTION 9.0 ROLLING LOAD TEST Hook—up/Couple tractor/jeep to king pin of hydraulic trailer and verify engagement. Q.C.: Retract trailer landing gear to their up-most stored position and verify. ' Q.C.: Connect Electrical Wiring Harness Coupler to hydraulic trailer, and verify. Q.C.: Connect Air Brake Couplings to hydraulic trailer, and verify. Q.C.: Start up tractor, check—out and verify the following: 9.5.1 Running lights turn ON/OFF in correspondence with tractor. Q.C.: 9.5.2 Brake lights turn ON/OFF in correspondence with brake peddle and tractor brake lights. Q.C.: ‘9.5.3 Turn signal lights to blink in correspondence with tractor turn signal lights. LEFT TURN SIGNAL: Q.C RIGHT TURN SIGNAL: Q.C 9.5.4 Turn off the tractor. 'Q.C.: Before Performing the following road test verify the following: 9.6.1 Outriggers are in the retracted positions. Q.C.: 9.6.2 Leveling cylinders are fully retracted up. ’ Q.C.: 9.6.3 Electrical Power Cable has been disconnected. v Q.C.: r FACTORY ACCEPTANCE.TEST PROCEDURE 9.7 WHC-SD-WM—ATP-IIZ 11/08/94 9.6.4 All loose hand tools or any loose items have been removed from trailer, strongback and container. Q.C.: 9.6.5 Pendent control and cable has been removed and stored. Q.C.:, 9.6.6 Bulk weight has been added to system to bring trailer to its designed 200,000 Lbs. rolling load capacity. Q.C.: ' 9.6.7 Verify that the strongback, container, and added bulk weight is secured to the trailer. (Ref. use trailer tie downs to secure load). Q.C.: Rolling Load Test Procedure 9.7.1 Start up tractor and pull trailer forward and backward within the yard as space allows. Q.C.: 9.7.2 TeSt trailer brakes by causing the trailer to come to an abrupt stop while rolling forward and while rolling backward. Verify all braked trailer wheels lock-up Q.C.: 9.7.3 Verify and log minimum turning radius for hydraulic trailer. Obtain the minimum turning radius by theoretical calculation or by minimum turn demonstrated by pulling trailer into street and backing trailer into yard with a minimum turning maneuver. MINIMUM TURNING RADIUS: CALCULATED: DEMONSTRATED: .Q.C.: 9.7.4 Return trailer to Yard and disconnect from tractor. ’ Q.C.: 9.7.5 Visually inspect hydraulic trailer for any signs of structural damage. Q.C.: 9.7.6 MT test trailer welds as designated by manufacturer. . Q.C.: 18 FACTORY ACCEPTANCE TEST PROCEDURE WHC—SD-WM-ATP-llz 11/08/94 SECTION 10.0 CONCURRENCEZCOMMENTS 10.1 Peopie verifying this test by use of their initiais, fiii in information beiow. ' InitiaTS Name Position Company Initials Name Position Company InitiaTs Name - _ Position » Company Initiais Name I Position Company This includes the Fuhctionai/Pro,of10ad/R0Hing Load Testing of the Westinghouse Hydrauh‘c Traiier WHC-S—OZSG. 10.2 Comments ...
View Full Document

This note was uploaded on 01/11/2011 for the course BUSINESS ACC9 taught by Professor Yeetan during the Spring '10 term at Sunway University College.

Page1 / 23

10104026 - Page 1 of I ten?" 608815 2. To:...

This preview shows document pages 1 - 23. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online