Problem Set 4 Solutions

Problem Set 4 Solutions - Problem Set 4 Solutions F301 Fall...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Problem Set 4 Solutions F301 Fall 2010 Question 1 Initial cost 200,000 First cf 21,000 r 0.14 r-g 0.1050 g 0.0350 3.50% Questions 2 - 4 0 1 2 3 Cash flows (300,000) (10,000) 80,000 120,000 Accumulated Sum (10,000) 70,000 190,000 Needed after Year 3 110,000 Fraction of Year 4 needed 0.92 Undiscounted payback period 3.92 years Project would be accepted. Discount rate 12% 0 1 2 3 Cash flows (300,000) (10,000) 80,000 120,000 Present values (8,929) 63,776 85,414 Accumulated Sum (8,929) 54,847 140,261 Still need at Year 5 Discounted payback period Project would be rejected. NPV (15,386) NPV is negative. Project would be rejected. IRR 10.37% This is the rate at which the project just pays off Does not exist . Project does not pay back within five years on a
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
at the end of five years on a discounted basis. Question 5 a. b. Question 6 Possible problems with IRR: 1) Some series of cash flows have more than one legitimate 2) IRR does not provide a scale of dollars, so the project wi not always the project with the highest NPV. 3) For some series of cash flows, an IRR does not exist.
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/13/2011 for the course BUS A202 taught by Professor Tindall during the Spring '10 term at IUPUI.

Page1 / 6

Problem Set 4 Solutions - Problem Set 4 Solutions F301 Fall...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online