Acct 3333 Ch 4 Pg 155 example

Acct 3333 Ch 4 Pg - Labour Type Apprentice Rate/Hr $16.00 Assembly Department Preparation Department Item Table Chairs Beds Enter Qty 150 1200 180

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Labour Type: Apprentice Rate/Hr. $16.00 Preparation Department Assembly Department Item Qty Hrs/unit Total hrs Rate Total cost Item Qty Hrs/unit Total hrs Rate Total cost TOTAL Table 150 0.05 7.5 $16.00 $120.00 Table 150 0.05 7.5 $16.00 $120.00 $240.00 Chairs 1200 0.05 60 $16.00 $960.00 Chairs 1200 0.1 120 $16.00 $1,920.00 $2,880.00 Beds 180 0.05 9 $16.00 $144.00 Beds 180 0.05 9 $16.00 $144.00 $288.00 Enter. 200 0.05 10 $16.00 $160.00 Enter. 200 0.05 10 $16.00 $160.00 $320.00 86.5 $1,384.00 146.5 $2,344.00 $3,728.00 Labour Type: Journeyman Rate/Hr. $25.00 Preparation Department Assembly Department Item Qty Hrs/unit Total hrs Rate Total cost Item Qty Hrs/unit Total hrs Rate Total cost TOTAL Table 150 0 0 $25.00 $- Table 150 0.3 45 $25.00 $1,125.00 $1,125.00 Chairs 1200 0 0 $25.00 $- Chairs 1200 0.25 300 $25.00 $7,500.00 $7,500.00 Beds 180 0 0 $25.00 $- Beds 180 0.25 45 $25.00 $1,125.00 $1,125.00 Enter. 200 0 0 $25.00 $- Enter. 200 0.3 60 $25.00 $1,500.00 $1,500.00 0 $- 450 $11,250.00 $11,250.00 Labour Type:
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/14/2011 for the course ACCT 3333 taught by Professor J.d during the Spring '08 term at Saint Mary's University Texas.

Page1 / 2

Acct 3333 Ch 4 Pg - Labour Type Apprentice Rate/Hr $16.00 Assembly Department Preparation Department Item Table Chairs Beds Enter Qty 150 1200 180

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online