budgetary control & responsibility acctng

budgetary control & responsibility acctng -...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: BUDGETARY CONTROL AND RESPONSIBILITY ACCOUNTING TRUE-FALSE STATEMENTS 1. Budget reports comparing actual results with planned objectives should be prepared only once a year. 2. If actual results are different from planned results, the difference must always be investigated by management to achieve effective budgetary control. 3. Certain budget reports are prepared monthly whereas others are prepared more frequently depending on the activities being monitored. 4. The master budget is not used in the budgetary control process. 5. A master budget is most useful in evaluating a manager's performance in controlling costs. 6. A static budget is one that is geared to one level of activity. 7. A static budget is changed only when actual activity is different from the level of activity expected. 8. A static budget is most useful for evaluating a manager's performance in controlling variable costs. 9. A flexible budget can be prepared for each of the types of budgets included in the master budget. 10. A flexible budget is a series of static budgets at different levels of activities. 11. Flexible budgeting relies on the assumption that unit variable costs will remain constant within the relevant range of activity. 12. Total budgeted fixed costs appearing on a flexible budget will be the same amount as total fixed costs on the master budget. 13. A flexible budget is prepared before the master budget. 14. The activity index used in preparing a flexible budget should not influence the variable costs that are being budgeted. 15. A formula used in developing a flexible budget is: Total budgeted cost = fixed cost + (total variable cost per unit X activity level). 16. Flexible budgets are widely used in production and service departments. 17. A flexible budget report will show both actual and budget cost based on the actual activity level achieved. Test Bank for Managerial Accounting, Second Edition 18. Management by exception means that management will investigate areas where actual results differ from planned results if the items are material and controllable. 19. Policies regarding when a difference between actual and planned results should be investigated are generally more restrictive for noncontrollable items than for controllable items. 20. A distinction should be made between controllable and noncontrollable costs when reporting information under responsibility accounting. 21. Cost centers, profit centers, and investment centers can all be classified as responsibility centers. 22. More costs become controllable as one moves down to each lower level of managerial responsibility. 23. In a responsibility accounting reporting system, as one moves up each level of responsibility in an organization the responsibility reports become more summarized and show less detailed information....
View Full Document

Page1 / 34

budgetary control & responsibility acctng -...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online