HW02 F08_Key.doc 1 MGMT 460: HW 02 40 Points (Due: Sept. 24, 2008) Do not write only answers, show calculations . Question 1 (12 points total): For the information shown, answer the following. ( Tiebreaker: The largest task number comes first.). (a.) Develop the precedence diagram ( 2 points ) (b.) Determine the target cycle time in seconds and the lower bound on number of stations needed for a desired output of at least 535 units in a 7.5-hour day. Cycle time should be integer . ( 2 points ) Cycle time = 7.5 [hours] * 3600 [sec/hour] / 535 [units / day] = 50.46 Æ 50 sec/unit (will produce 540 units per day). Min. number of stations = 145 / 50 = 2.9 Æ 3 stations (c.) Perform line balancing using the LPT method, calculate effective cycle time, line efficiency and show layout. ( 3 points ) Effective CT = 48 sec / unit Line Efficiency = 100 * 145 / (4 * 48) = 75.5% (d.) Repeat line balancing using the RPW method and calculate line efficiency. Add a table showing task weights in addition to tables similar to those in part (c). ( 5 points ). Task Task time (Seconds) Immediate Predecessor 1 28 - 2 14 1 3 12 - 4 8 3 5 13 4 6 9 2 7 27 6 8 14 5, 6 9 10 8 10 10 7, 9 Total 145 Tasks Arranged in LPT order Task No 1 7 8 2 5 3 10 9 6 4 Stn. Tasks Cum. Station time Eligible 1 1, 2 28, 42 1, 3 / 2, 3 / 3, 6 2 3, 6, 7 12, 21, 48 3, 6 / 6, 4 / 7, 4 / 4 3 4, 5, 8, 9 8, 21, 35, 45 4 / 5 / 8 / 9 / 10 4 10 10 10 Task No 1 2 3 4 5 6 7 8 9 10 Weight 112 84 67 55 47 70 37 34 20 10 Tasks Arranged in RPW order Task No 1 2 6 3 4 5 7 8 9 10 1, 2 42 3, 6, 7 48 4, 5, 8, 9 45 10 10 28 14 9 27 12 8 13 10 10 14 1 2 6 8 7 3 4 5 9 10 KEY
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
HW02 F08_Key.doc 2 Effective CT = 42 sec / unit Efficiency = 100 * 145 / (4 * 42) = 86.3% Question 2 (6 points total): Consider the precedence diagram for an assembly operation shown in the figure to the right. (All task times shown below are in seconds) The target CT (Cycle time) is 50 seconds/unit.
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 5

HW02-F08_Key - KEY MGMT 460: HW 02 Question 1 (12 points...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online