Quiz[1]-key F08

Quiz[1]-key F08 - MGMT 460 Fall 2008 Print your name (Last...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1 MGMT 460 – Fall 2008 Quiz No.1: 9/17/2008 Print your name (Last name, First name): ___ ___________________ Last three digits of PUID.: _________ Class time: _________ Question 1 : Please add up the last three digits of your SSNo. Total = _______ Question 2: (8 points) – Consider the manufacturing process shown in the diagram below. There are two machines in parallel at stage 1 (M1 and M2), which process component A. Component A is afterwards processed on machine M3. Component B on the other hand is first processed on machine M4. At M5, one unit of A and one unit of B are assembled. Task times are given in the diagram, except for M5 where the time is equal to the sum of the last three digits of your SSNo. (see question 1). A B (a)
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

Quiz[1]-key F08 - MGMT 460 Fall 2008 Print your name (Last...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online