QUIZ 18 - 18061 1.

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
1. 18-061   A project development team at Midwest Construction was assigned the task of improving the  efficiency of the firm's accounting information system. As part of the ________ step in systems  development life cycle, the team has initiated an end user training program in preparation for  switching over to the new system.    Student  Response Value Correct Answer Feedback A.  systems analysis 0%       B.  operations and  maintenance      C.  implementation  and conversion      D.  physical design      E.  conceptual design       Score: 0/4    2. 18-048   The ________ method of gathering information helps to determine how a system should work.    Score: 0/4    3. 18-050   How frequently should an AIS be monitored and any minor modifications be made to it? 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
  Score: 4/4    4. 18-040   During what step in systems analysis is an examination made of each development activity to  define the problem to be solved?    Score: 4/4    5. 18-031   There are several important aspects to be considered during a feasibility study. The aspect that  asks the question, "Can people use the system and will they use it?" is called    Score: 4/4 
Background image of page 2
  6. 18-077   Which of the following is the most important and frequently analyzed aspect of a feasibility study?    Score: 4/4    7. 18-047   The ________ method of gathering information helps to determine how a system actually works.    Score: 4/4    8. 18-003   What is the correct sequence of the phases in the systems development life cycle?   
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
  Score: 4/4    9. 18-009   Who is responsible for preparing the specifications that are used to create the programs?    Score: 0/4    10. 18-063   Refer to the PERT diagram below, where the numbers next to the arrows refer to the number of  days required for completion of the corresponding activity. What is the critical path?   Score: 4/4   
Background image of page 4
18-033   It is appropriate to develop several different design approaches to meeting system requirements for  a project. Capital budgeting techniques are used to evaluate the economic merits of each  alternative. The technique where estimated future cash flows are discounted back to the present is  referred to as    Score: 4/4    12. 18-010   Whether systems changes are major or minor, most companies go through a system development  life cycle. How many steps are there in this cycle?    Score: 4/4    13. 18-005
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/24/2011 for the course COB acct taught by Professor Smith during the Spring '09 term at California Coast University.

Page1 / 30

QUIZ 18 - 18061 1.

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online