MGMT404_WK3_Practice_Quiz

MGMT404_WK3_Practice_Quiz - Page 1 MGMT404 Week 3 Practice...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Page 1 Page 1 MGMT404 Week 3 Practice Questions Study Mate Transcript Questions [Carefully read the question and write down the letter that corresponds with the correct answer. The answer key is located at the bottom of this document to check answers.] 1. If you have 400% allocated for Builder, which of the following is NOT one of the ways that this information can be represented in Microsoft Project using a weekly duration ? a. 4 resources at 100% for 1 week b. 2 resources at 100% for 2 weeks c. 8 resources for 50% for 1 week d. 1 resource for 100% for 4 weeks. 2. Which view below will show over allocated resources? a. Gantt Chart View b. Tracking Gantt View c. Resource Usage View d. Task Usage View 3. Crashing is a Project Scheduling Technique that does what? a. Reduces Scope of the project b. Reduces Project Duration by adding resources c. Reassigns the resources to tasks not on the critical path d. None of the above 4. As a project manager what option/s do you have to reduce over-allocations of resources if
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/23/2011 for the course MGMT 404 taught by Professor Smith during the Spring '10 term at DeVry Arlington.

Page1 / 2

MGMT404_WK3_Practice_Quiz - Page 1 MGMT404 Week 3 Practice...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online