8000 8000 shortage of 1500 in p3 8500 4500 increase

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: age of 1500 in P3. 8500 4500 Increase production by 6000 6000 500 in P1, P2 and P3. 6000 6000 3 1000 1000 -1500 0 What’s wrong? 6500 6000 We have inventory in P4. 0 1500 Generally, we want zero inventory at the end of 6500 6500 6500 4500 planning horizon. 1500 2000 0 0 Reduce P4 by 1500. You could do these two adjustments in one step. 9 1200 4500 4800 4300 800 0 0 0 0 3400 4000 4000 4000 800 800 2200 1700 900 600 3400 4000 4000 4000 800 2200 1700 900 600 800 on hand at the start of planning horizon. What’s wrong with the basic plan? Capacity exceeded in Feb., Mar. and Apr. Incorrect inventory: Apr. Adjustment 1: Move 500 + 800 + 300 to Jan. + Add 600 to Jan. What’s wrong with the adjusted plan? 600 left after June. Reduce 600 in May 10 Ex 4. Level Period Period Constraints: No shortages. Capacity 4000. Must have at least 600 units at the end of April. Ex Ex 4. Level, Alternate Alternate solution Constraints: No shortages. Capacity 4000. Must have at least 600 units at the end of April. Average = (2000...
View Full Document

This note was uploaded on 01/31/2011 for the course MGMT 361 taught by Professor Panwalker during the Spring '10 term at Purdue University-West Lafayette.

Ask a homework question - tutors are online