HW5 Solution F2010 - Chapter8Problem3 Slack= 0 START A 21 0...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Chapter 8 Problem 3 Slack = 0 Slack 0 Slack  0 Slack = 0 Slack = 0 Slack  0 Slack  0 Slack  0 START A 0 21 B 21 22 C 22 23 D 23 53 E 53 72 F 72 79 G 79 82 H 82 85 21 0 21 1 21 22 1 22 23 30 23 53 19 53 72 7 72 79 3 79 82 3 82 85 a. The project completion time is 136 days. Slack  7 Sla b. The critical activities are A, B, C, D, E, F, G, H, L, M, N, S, T, V, and W. I 72 78 N 6 79 85 20 Slack  8 Slack 0 Slack = 0 Sla J 72 77 L 85 94 M 94 104 O 5 80 85 9 85 94 10 94 104 5 Slack 11 Sla K 72 74 Q 2 83 85 3 Sla R 2
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Slack = 33 U 85 95 10 118 128 ack = 0 Slack = 0 Slack = 0 104 124 S 124 127 T 127 128 104 124 3 124 127 1 127 128 ack = 14 Slack = 14 Slack = 0 Slack = 0 104 109 P 109 114 V 128 135 W 135 136 FINISH 118 123 5 123 128 7 128 135 1 135 136 ack = 21 PCT= 136 104 107 125 128 ack = 22 104 106 126 128
Background image of page 2
Chapter 8 Problem 5 Slack = 1.5 Slack = 0.5 Slack = 0.5 A 0.0 4.0 C 5.0 11.0 E 11.0 14.5 4.0 1.5 5.5 6.0 5.5 11.5 3.5 11.5 15.0 START FINISH Slack = 0.0 Slack =
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 5

HW5 Solution F2010 - Chapter8Problem3 Slack= 0 START A 21 0...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online