Unique Id Name Start Date End Date % complete 1 Pre-project elements 9/17/2008 9/25/2008 100 1 Brainstorming 9/17/2008 9/24/2008 100 1.1 Creation of PDPP 9/21/2008 9/24/2008 100 1.2 Presentation of PDPP 9/25/2008 9/25/2008 100 1.3 10/1/2008 10/20/2008 100 1.3.1 10/1/2008 10/8/2008 100 1.3.2 Bill of Materials 10/8/2008 10/15/2008 100 1.3.2.1 10/8/2008 10/15/2008 100 1.3.3 10/15/2008 10/19/2008 100 1.3.4 10/15/2008 10/22/2008 100 2 Hovercraft Construction 10/1/2008 . .. 100 2.1 10/1/2008 10/8/2008 100 2.1.1 specific planum design 10/5/2008 10/17/2008 100 2.1.2 10/1/2008 10/4/2008 100 2.1.2.1 Fan mount 10/1/2008 10/3/2008 100 2.1.2.2 Protective fan cage 10/1/2008 10/3/2008 100 2.1.3 Specific circuit design 10/1/2008 10/4/2008 100 2.1.3.1 wiring diagram 10/1/2008 10/3/2008 100 2.1.3.2 10/1/2008 10/1/2008 100 2.1.4 Robot program flow chart 10/1/2008 10/8/2008 100 2.2 Wiring 11/1/2008 11/8/2008 100 2.2.1 Breadboard circuits 11/1/2008 11/2/2008 100 2.2.2 11/3/2008 11/7/2008 100 2.2.3 Test/enhance 11/8/2008 11/8/2008 100 2.3 Initial programming 10/28/2008 11/8/2008 100 2.3.1 10/28/2008 10/31/2008 100 2.3.2 11/1/2008 11/8/2008 100 2.4 10/1/2008 10/10/2008
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 100 2.5 Protyping 10/23/2008 10/28/2008 100 2.5.1 prototype hull/planum 10/23/2008 10/28/2008 100 2.5.1.1 Form male foam mold 10/23/2008 10/23/2008 100 2.5.1.2 10/24/2008 10/27/2008 100 2.5.1.3 form fiberglass molds 10/24/2008 10/27/2008 100 2.5.1.4 glue frame to molds 10/27/2008 10/27/2008 100 2.5.1.5 complete structure 10/28/2008 10/28/2008 100 2.5.2 Prototype fan mounting 10/23/2008 10/28/2008 100 2.5.3 prototype circuitry 10/23/2008 10/28/2008 100 2.5.4 prototype program 10/23/2008 10/28/2008 100 2.6 testing of prototypes 10/28/2008 10/28/2008 100 2.7 combination of parts 11/1/2008 11/10/2008 100 2.8 testing 11/10/2008 12/1/2008 90 2.9 modifacations 11/11/2008 12/4/2008 90 2.10. final design 12/5/2008 12/5/2008 2.11 Competition 12/12/2008 12/13/2008 presentation/ report concept info preformance responsibilities design blueprint design diagrams project boards and rear sensors safes materials frames Precedence...
View Full Document

This note was uploaded on 01/24/2011 for the course ENES enes100 taught by Professor Staff during the Spring '10 term at Maryland.

Page1 / 2

Team%20Gantt%20Chart.xls - 100 2.5 Protyping 10/23/2008...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online