Name Date Sec. # Assign. No. Description # L W H Takeoff Quantity U/M 1 Structural Slab and Columns 2 3 Values shaded in blue are not actual values for this project. They are for demonstration purposes only. 4 Blue shading will not be used in your submission, your values will be actual 5 6 7 4th Floor Structural Slab Concrete CF/LF Void 8 66" x 20" Pans -1 150.25 8.935 -1342.48 CF 9 53" x 20" Pans -1 37.5 7.130 -267.38 CF 10 30" x 20" Pan -1 CF 11 20" x 20" Pan -1 CF 12 10" x 20" Pan -1 CF 13 14 Area 15 25" Slab assembly with 5" Slab and 20" void 1 10700 2.083 22291.67 CF 16 17 18 # L W H 19 Mechanical Chase 21'-6" x 9'-1" -1 21.5 9.083 2.083 -406.86 CF 20 21 22 23 Total CF Concrete 20274.95 CF 24 Convert to CY (CF/27) 750.92 CY 25 Add waste @3% 773.45 CY 26 Total CY 4th Floor Suspended Structural Slab Concrete 774.000 CY 27 28 # L W H 29 Column Concrete 30 Third Floor 31 Column 10/D (Most are these) 1 2 2 13.917 55.67 CF 32 Column 13.4/A.09 1 1.5 1.5 16 36.00 CF 33 Continue Adding third floor columns 34 12th Man 2/27/2019 501 - 504 Assignment 5 - UTSA Science & Engineering Building
No. Description # L W H Takeoff Quantity U/M 35 36 37 38 39 40 Total CF Concrete 91.67 CF 41 Convert to CY (CF/27) 3.40 CY

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture