IELM120 1 Material Requirements Planning (MRP)
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
IELM120 2 Learning Objectives Understand what MRP is and does Explain how an MRP system is different from a JIT system Use Explosion Calculus to develop MRP
Background image of page 2
IELM120 From Aggregate Plan to MPS to MRP 3 Forecast Master Production Schedule (MPS) MRP Bill of material Inventory record Reports Aggregate Plan (product groups) Firm orders Time-phased plan how many + when we will build each end item.
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
IELM120 Material Requirements Planning Dependent demand Demand for one item is related to the demand for another item. Information system to determine Number of parts, components, materials needed for a product order And schedule information – dates when Orders for materials should be released, based on lead times. Based on a master production schedule 4
Background image of page 4
IELM120 5
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
IELM120 Bill of Materials (BOM) 6 A list of all the assemblies, subassemblies, parts, and raw materials that are needed to produce one unit of a finished product, e.g., BOM of a bicycle (partial) •Bicycle Frame Tubing Seat Assembly Wheel (2) Tire Rim Assemble Rim Hub Spoke (28) Tube
Background image of page 6
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/28/2011 for the course IELM 120 taught by Professor Fu,qi during the Spring '09 term at HKUST.

Page1 / 18

Module I_Material - Material Requirements Planning(MRP IELM120 1 Learning Objectives Understand what MRP is and does Explain how an MRP system is

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online