ma20 - Solutions to Spring 2009 Exam 1 Part 2 15. (C)...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Solutions to Spring 2009 Exam 1 Part 2 15. (C) First, calculate how many hours a single employee worked during the last 25 work days. 25 days x 8 hours/day = 200 hours per worker. 16. (E) This is a question involving decision making under uncertainty. Sam knows the possible outcomes, but he cannot assign probabilities to these outcomes. Without more information about Sam’s decision (maximax, maximin, equally likely, etc.), we cannot tell what Sam should do. 17. (B) Management science is a set of mathematical models and algorithms for solving those models, whose goal is to efficiently utilize scarce resources. It includes such tools as decision theory, linear programming, and the transportation method. 18. (A) The best way to approach this question is to construct a decision table. The maximin criteria requires the decision maker to find the minimum outcome for each decision alternative, and choose the greatest result out of those minimum outcomes. That is, it requires the decision maker to assume the worst and pick the best
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/03/2011 for the course MAN 4504 taught by Professor Benson during the Spring '08 term at University of Florida.

Page1 / 3

ma20 - Solutions to Spring 2009 Exam 1 Part 2 15. (C)...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online