GNB 13e Solutions Ch 03 Case

GNB 13e Solutions Ch 03 Case - C3-34 Kelvin Aerospace,...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: C3-34 Kelvin Aerospace, Inc.1. Recomputed Predetermined Overhead RateOriginal manufacturing overhead$3,402,000 Cost of automated milling machine$348,000 Cost of technician/programmer$50,000 Revised manufacturing overhead$3,800,000 Original direct labor hours63,000 Reduction in direct labor hours6,000 Revised direct labor hours57,000 Revised manufacturing overhead$3,800,000 Revised direct labor hours57,000 Revised overhead rate$66.67 The revised overhead rate will be higher because the revised manufacturing overhead cost will be raised by $398,000 while the revised direct labor hours will be lowered by 6,000 DLH.2. Effect of Revised Overhead Rate on Non-Milling Machine JobsAcquisition of the automated milling machine center will increase the costs of all jobs because the company uses a plantwide overhead rate. This means that jobs that do not use the new milling center will be subsidizing jobs that require the milling center....
View Full Document

This note was uploaded on 02/10/2011 for the course UGBA 102B taught by Professor Fan during the Spring '08 term at University of California, Berkeley.

Page1 / 2

GNB 13e Solutions Ch 03 Case - C3-34 Kelvin Aerospace,...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online