ENGR13100_Project_Final_Report_Rubric

ENGR13100_Project_Final_Report_Rubric - Date: _ Evaluation...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
endix (maximum one page) if you believe it will provide useful information for readers in ept Generation) + (Concept Reduction) + (Detailing and Evaluating Selected Solution / I ntegrating the Report) Date: ____________ Evaluation of Commuter System 2020 – FINAL REPORT Team No. _____ ENGR13100 – Fall 2010 Section No. _____
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Date: ____________ Evaluation of Commuter System 2020 – FINAL REPORT Team No. _____ ENGR13100 – Fall 2010 Section No. _____ Team Members: 1. 2. 3. 4. Cover Page and Table of Contents Rubric Category Objectives Professional (1 Pt) Acceptabl e (0.5 pts) Needs Improvement (0 pts) 1.Cover Page & Table of Contents A. The cover page includes the following: Document title Section number Team number Names of all contributing team members Date of submission B. The report includes a table of contents : Heading titles Page numbers A. At least 3 boxes are checked and B. Both boxes are checked A. At least 1 box is checked and B. 1 box is checked A. 0 boxes are checked or B. 0 boxes are checked Executive Summary Rubric Category Objectives Professional (3 Pts) Acceptabl e (2 Pts) Needs Improvement (1 pts) Missing (0 pts) 2.Executive Summary The Executive Summary includes: Description of the existing system, limitations and need established Scope of the project is defined and related to established need Criteria of importance are defined (provide evidence of quality of solution and inform selection of an alternative) Robust design process describing and evaluating alternative solutions Project implementation is described including details of chosen solution Evidence that selected solution will meet the established needs. 5 or 6 boxes are checked 3 or 4 boxes are checked 1 or 2 boxes are checked 0 boxes are checked
Background image of page 2
Date: ____________ Evaluation of Commuter System 2020 – FINAL REPORT Team No. _____ ENGR13100 – Fall 2010 Section No. _____ Cover Page, ToC, and Executive Summary score: __________/4 Milestone 1 - Problem Scoping (Revision) Category Objectives Professional (3 Pts) Acceptabl e (2 Pts) Needs Improvement (1 pt) Missing (0 pts)
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 6

ENGR13100_Project_Final_Report_Rubric - Date: _ Evaluation...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online