Home Work 1 - LABOR OPERATION OPERATOR YIELD # OF UNITS LOT...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
LABOR HOURS TOTAL RAW OVERHEAD OPERATION OPERATOR YIELD # OF UNITS LOT SIZE LOTS PER LOT HOURS COST 300% TOTAL COST Assembly Step 1 Assembler 90.0% 60 6.00 Assembly Step 2 Assembler 80.0% 60 6.00 Inspection QA 75.0% 60 1.00 Assembly Step 3 Assembler 70.0% 60 5.00 Inspection QA 90.0% 60 1.00 Test Test Technician 90.0% 60 3.00 Ship Shipping Clerk 100.0% 60 0.50 UNITS TO SHIP 500 TOTAL YIELD MATERIAL Components Component RAW OVERHEAD Required Cost COST 5% TOTAL COST Material 1 $1.50 Material 2 $2.25 Material 3 $1.80 Totals LABOR 300% LABOR OH MATERIAL 5% MATERIAL OH TOTAL LABOR, MATERIAL, AND OVERHEAD TOTAL COST RATES Assembler QA 40% PROFIT (ON SELL PRICE) $8.00 $- $12.00 $10.00 TOTAL UNIT PRICE Test Technician Shipping Clerk
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
LABOR HOURS TOTAL RAW OVERHEAD OPERATION OPERATOR YIELD # OF UNITS LOT SIZE LOTS PER LOT HOURS COST 300% TOTAL COST Assembly Step 1 Assembler 90.0% 1637 60 28 6.00 168.00 $120.00 $360.00 $480.00 Assembly Step 2 Assembler 80.0% 1473 60 25
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/15/2011 for the course ENGR 262 taught by Professor Bradley during the Spring '09 term at UMass Lowell.

Page1 / 3

Home Work 1 - LABOR OPERATION OPERATOR YIELD # OF UNITS LOT...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online