kristens cookies

kristens cookies - Solution to Kristen's Cookie Company (A)...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Solution to Kristen's Cookie Company (A) Before answering specific questions, it is useful to make a diagram of the overall process: Order Entry Wash Bowl, Mix Ingredients Resource: Self Capacity: 3 Cycle Time: 6 minutes Fill Tray Resource: Roommate Capacity: 1 Cycle Time: 2 minutes Bake Resource: Oven Capacity: 1 Cycle Time: 9 minutes Start Oven Resource: Roommate, Oven Capacity: 1 Cycle Time: 1 minute Remove Resource: Roommate Capacity: 1 Cycle Time: 0 minutes Cool Resource: none Capacity: 1 Cycle Time: 5 minutes Pack, Collect Money Resource: Roommate Capacity: 1 Cycle Time: 3 minutes Note that in this diagram, activities are arranged in columns to indicate which resources are being used. Inside each activity symbol are written the capacity (in dozens of cookies) and the cycle time (in minutes). 1. How long will it take for you to fill a rush order? Assuming this order is for one dozen cookies, we will need to do the following: Activity Resource Cycle Time Start Time Finish Time Order Entry E-mail 0 minutes 00:00 00:00 Wash Bowl, Mix Self 6 minutes 00:00 06:00 Fill Tray Self 2 minutes 06:00 08:00 Prepare Oven Roommate 1 minute 08:00 09:00 Bake Oven 9 minutes 09:00 18:00 Remove Roommate 0 minutes 18:00 18:00 Cool None 5 minutes 18:00 23:00 Pack, Collect Money Roommate 3 minutes 23:00 26:00 Therefore, the minimum time to fill an order is 26 minutes. We can illustrate the sequence of events with a Gantt chart: Competitive Advantage from Operations Professor Juran 2 2. How many orders can you fill in a night, assuming you are open four hours each night? Here is a Gantt chart for two batches of one dozen cookies each. It doesn't take twice as long to produce two batches as it does to produce one batch, because you can start mixing the second batch without having to wait for the whole first-batch process to be completed (you can start washing out the bowl as soon as you finish filling the tray). It is possible to produce two batches in 36 minutes....
View Full Document

This note was uploaded on 02/15/2011 for the course BUAD 311 at USC.

Page1 / 8

kristens cookies - Solution to Kristen's Cookie Company (A)...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online