1. Which one of the following best describes the critical path of a PERT/CPM network? C) The sequence of activities between a project’s start and finish that takes the longest time to complete. 2. The Project Manager for the installation of new equipment in a plant is likely to do all of the following EXCEPT: C) delegate the responsibility for making tough decisions to the members of the project team. 3. Scope creep is one of the primary causes of project failure. A) True 4. The work breakdown structure is a statement of all work that has to be completed. A) True 5. In an activity-on-node [AON] network, the nodes represent ____________, whereas the arcs represent ____________. C) activities; precedence relationships 6. A project has three paths. A–B–C has a length of 25 days. A–D–C has a length of 15 days. Finally, A–E–
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: C has a length of 20 days. Which one of the following statements is TRUE? B) The expected duration of this project is 25 days. 7. Which one of the following statements is TRUE? D) PERT/CPM assumes that two activities tied together by a precedence relationship cannot be worked on simultaneously. 8. The ____________ is the shortest possible time to complete the activity. Correct Answer(s): optimistic; optimistic time; crash time (CT); crash time 9. A(n) ____________ is an interrelated set of activities that has a definite starting and ending point and that results in a unique outcome for a specific allocation of resources. Correct Answer(s): project 10. A critical path is any sequence of activities between a project’s start and finish. B) False...
View Full Document

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern