PERT Networks PERT Networks In PERT the duration of any activity is indeterministic. It bases the duration of an activity on three estimates: Optimistic Time, a Most Likely Time, m Pessimistic Time, b
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
The range [a, b] is assumed to enclose all possible estimates of the duration of an activity. Based on these estimates, the average time, f8e5 D, and variance , ν , are computed as follows: 6 4 b m a D + + = 2 6 - = a b ν CPM calculations given earlier will be applied directly, with f8e5 D replacing the single estimate D.
Background image of page 2
Consider the network with the estimates of the activities given below:
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Activity a m b f8e5 D ν (1,2) 2 5 8 5 1 (1,3) 1 4 7 4 1 (2,3) 0 0 0 (2,4) 2 4 6 (2,6) 5 7 12 (3,4) 3 5 10 (3,5) 3 6 9 (4,5) 4 10 6 (4,6) 2 5 8 (5,6) 2 4 6 0 0 4 0.44 7.5 1.36 5.5 1.36 6 1 6.33 1 5 1 4 0.44
Background image of page 4
1 3 2 5 4 6 Dummy 4 6 4 7.5 5 6.33 0 0 5 5 16.83 20.83 20.83 16.83 10.5 5 5 0
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Thus the mean duration of the project = 20.83 days The variance of the duration of the project =
Background image of page 6
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 8
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 10
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/23/2011 for the course MATH 112 taught by Professor Ritadubey during the Spring '11 term at Amity University.

Page1 / 10

L27_Project Scheduling - PERT - PERT Networks PERT In PERT...

This preview shows document pages 1 - 10. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online