BUS410Fall 2010HW1314NA

BUS410Fall 2010HW1314NA - B US 410, Homw Work, Chapter 13,...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
BUS 410, Homw Work, Chapter 13, 14 Name___________________________________ MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) Which type of fourth - generation language tools are end - users most likely to work with? 1) A) report generators and query languages B) report generators and application generators C) PC software tools and query languages D) PC software tools and report generators 2) Users prefer systems that 2) A) are oriented to facilitating organizational tasks and solving business problems. B) work with existing DBMS. C) are able to provide optimum hardware and software efficiency. D) are capable of storing much more data than they need. 3) Acceptance testing 3) A) includes all the preparations for the series of tests to be performed on the system. B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned. C) tests each program separately. D) provides the final certification that the system is ready to be used in a production setting. 4) Which of the following tools would you use to control risk factors in an information systems project? 4) A) internal integration tools B) external integration tools C) formal planning tools and formal control tools D) All of the above 5) Formal planning and control tools 5) A) enable a project to have sufficient technical support for project management and development. B) enable a project manager to properly document and monitor project plans. C) portray a project as a network diagram with numbered nodes representing project tasks. D) consist of ways to link the work of the implementation team with users at all organization levels. TRUE/FALSE. Write 'T' if the statement is true and 'F' if the statement is false. 6) The most common form of IT - enabled organizational change is automation. 6) 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 7) The major variables in project management are 7) A) scope, time, cost, and performance. B) scope, time, cost, quality, and risk. C) time, cost, quality, performance, and risk. D) time, cost, scope, and performance. 8) Which process develops a detailed description of the functions that a new information system must perform? 8) A) feasibility study B) requirements analysis C) systems design D) test plan development 9) A CSF approach to establishing an enterprise's information requirements is especially suitable for 9) A) distinguishing between individual and organizational objectives. B) identifying the key entities and attributes of the organization's data. C)
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/23/2011 for the course OM 300 taught by Professor Bobsanders during the Spring '11 term at Essex County College.

Page1 / 6

BUS410Fall 2010HW1314NA - B US 410, Homw Work, Chapter 13,...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online