PS2-08-solutions - CE166 - Fall 2008 Question 1 Part A...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
CE166 - Fall 2008 Problem Set 2 Solutions Page 1 of 5 Professor Arpad Horvath Department of Civil and Environmental Engineering University of California, Berkeley Question 1 Part A The loaders travel 60 yd per cycle. They have a capacity of 1.5 yd 3 . The cycle takes 60 seconds. The average speed is 15 mi/hr. day yd day hr hr cycle cycle yd rate production time cycle hr mi hr yd mi yd time travel 3 3 634 8 sec 3600 sec 2 . 68 5 . 1 _ sec 2 . 68 sec 2 . 8 sec 60 _ sec 2 . 8 sec 3600 15 1760 60 _ The cranes have clamshells with 4 yd 3 capacity and a cycle time of 30 seconds. day yd day hr hr cycle cycle yd rate production 3 3 3840 8 sec 3600 sec 30 4 _ The dump trucks have a 10 yd 3 capacity and travel 6 miles to a site (12 miles round trip). The average speed is 25 mi/hr and the dumping time is 75 seconds. day yd day hr hr cycle cycle yd rate production time cycle yd yd time load time dump hr mi hr mi time travel time load time dump time travel time cycle 3 3 3 3 153 8 sec 3600 sec 1878 10 _ sec 1878 sec 75 sec 75 sec 1728 _ sec 75 4 sec 30 10 _ sec 75 _ sec 1728 sec 3600 25 ) 6 2 ( _ _ _ _ _ There is a 1.15 swell factor and all equipment is operated 8 hrs/day. The swell factor is not
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/27/2011 for the course CE 166 taught by Professor Horvath during the Spring '08 term at University of California, Berkeley.

Page1 / 5

PS2-08-solutions - CE166 - Fall 2008 Question 1 Part A...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online