System Implementation

System - Systems Implementation Systems Implementation involves The Construction Phase The Delivery Phase The Construction Phase of Systems

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
Systems Implementation Systems Implementation involves: The Construction Phase The Delivery Phase
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
The Construction Phase of Systems Implementation Objectives : To build and test a functional systems that fulfill business and design requirements. That may include: A database Application programs User and system interfaces, and Networks. To implement the interfaces between the new system and existing systems .
Background image of page 2
The Construction Phase of Systems Implementation Activity: Build and Test Networks (if Necessary) Build and test new networks and Modify existing networks for use by the new system. Record in the project repository for future reference. Network Designer /Engineer A specialist in the design, building, and testing LAN/WAN and their technologies Familiar with network architecture standards and new networking technology. Wireless technologies
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
The Construction Phase of Systems Implementation Activity: Build and Test Databases The end-product of this activity is an unpopulated database structure for new database. Revised database schema and test data details are also produced and placed in the project repository for future reference.
Background image of page 4
of Systems Implementation Activity: Install and Test New Software Package (if necessary) Review: New COTS documentation from the vendors. The integration requirements and program documentation developed during system design. Install new COTS software packages
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/28/2011 for the course BMGT 407 taught by Professor Staff during the Spring '08 term at Maryland.

Page1 / 26

System - Systems Implementation Systems Implementation involves The Construction Phase The Delivery Phase The Construction Phase of Systems

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online