MSP Assignment

MSP Assignment - Project Time Management Exercise using MSP...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
(A Pairing Option Available upon request) You have to use Microsoft Project (MSP) for the following questions Question 1 PERT The Denver Iron & Steel Company is expanding its operations to include a new drive-in weigh station. The weigh station will be a heated/air-conditioned building with a large floor and small office. The large room will have the scale, a 15-foot counter, and several display cases for its equipment. Before erection of the building, the project manager evaluated the project using PERT analysis. The activities with their corresponding times were recorded in Table 1. # Activity Optimisti c Most likely Pessimistic Preceding Tasks 1 Lay Foundation 8 10 13 2 Dig hole for scale 5 6 8 1 3 Insert scale bases 13 15 21 2 4 Erect frame 10 12 14 3 5 Complete building 11 20 30 4 6 Insert scales 4 5 8 5 7 Insert display cases 2 3 4 6 8 Put in office equipment 4 6 10 7 9 Finishing touches 2 3 4 8 10 Request inspection 1 2 3 5 11 Complete inspection
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/28/2011 for the course EGMT 5330 taught by Professor Jeong during the Spring '11 term at UH Clear Lake.

Page1 / 6

MSP Assignment - Project Time Management Exercise using MSP...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online