PMP_SampleQA3 - SAMPLE PMP PREPARATORY QUESTIONS AND...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: SAMPLE PMP PREPARATORY QUESTIONS AND ANSWERS 160 Free PMP Exam Prep Questions (Obtained from PM Connection: http://www.pmconnection.com/modules.php?name=Web_Links&l_op=viewlink&cid=9 ) http://www.bestsamplequestions.com/pmp-sample-questions/pmp-sample-questions.html 1. Regarding management and leadership all of the following are true except A. On a project, particularly a larger project, the project manager is generally expected to be the project's leader as well. B. Technical leadership is of primary importance in project management C. Managing is primarily concerned with consistently producing key results expected by stakeholders D. Leading involves establishing direction, aligning people, motivating and inspiring Answer: B 2. A company has to make a choice between two projects, because the available resources in money and kind are not sufficient to run both at the same time.Each project would take 9 months and would cost $250,000. The first project is a process optimization which would result in a cost reduction of $120,000 per year.This benefit would be achieved immediately after the end of the project. The second project would be the development of a new product which could produce the following net profits after the end of the project: 1 year: $ 15,000 2 year: $ 125,000 3 year: $ 220,000 Assumed is a discount rate of 5 % per year.Looking at the present values of these projects' revenues in the first 3 years, what is true? A. Both projects are equally attractive. B. The first project is more attractive by app.7%. C. The second project is more attractive by app.5%. D. The first project is more attractive by app.3%. Answer: D 3. A production process has been defined as part of an industrial equipment manufacturing project.The process is intended to produce steel bolts with a length of 20 cm.The acceptable control limits are 19.955 cm and 20.045 cm. The measurements made at the end of the process yielded the following results: 20.033 cm, 19.982 cm, 19,995 cm, 20.006 cm, 19.970 cm, 19.968 cm, 19.963 cm, 19.958 cm, 19.962 cm, 19.979 cm, 19.959 cm. What should be done? A. The process is under control.It should not be adjusted. B. The process should be adjusted. C. The control limits should be adjusted. D. The measuring equipment should be recalibrated. Answer: B 4. What are the 4 stages of team development? A. Forming, Storming, Norming, Performing. B. Enthusiasm, Hope, Panic, Solution. C. Assignment, Kickoff, Training, Communicating. D. Direction, Motivation, Cooperation, Collaboration . Answer: A 5. During a software project Earned Value Analysis is performed and gives the following results: EV: 523,000; PV: 623,000; AC: 643,000. Which results are correct?...
View Full Document

Page1 / 42

PMP_SampleQA3 - SAMPLE PMP PREPARATORY QUESTIONS AND...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online