CHAPTER 5 - Management Science II Dr.T.T.Narendran MODULE 3...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
Management Science II Dr.T.T.Narendran Indian Institute of Technology Madras MODULE 3 Production Planning And Control Inter Relationships Of Production Planning And Control
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Management Science II Dr.T.T.Narendran Indian Institute of Technology Madras
Background image of page 2
Management Science II Dr.T.T.Narendran Indian Institute of Technology Madras Aggregate Production Planning (APP) Aggregate Planning Guidelines Formulate output plans that adjust production activities to provide a rational response to demand Determine corporate policies regarding controllable variables Use a good forecast as the basis for planning
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Management Science II Dr.T.T.Narendran Indian Institute of Technology Madras Plan in appropriate units of capacity Maintain as stable a work-force as possible Maintain as much inventory control as needed Maintain as mush flexibility as possible Respond to demand fluctuations in a controlled manner Evaluate planning adequacy on a regular basis Aggregate Planning Plans a desired output over a time-range
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 9

CHAPTER 5 - Management Science II Dr.T.T.Narendran MODULE 3...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online