P11-4A+j&k - 33,000 $3.57 $117,711 Direct Labor 33,000...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Total Rate Variable Fixed Per Hour Rate Per Hr Rate Per Hr $7.80 $2.50 $5.30 Budgeted Overhead $327,600 $105,000 $222,600 $3,000F - $222,600 - AVO $222,600 - $3,000 = AVO $219,600 = Actual variable overhead costs (k) Using selected answers above, what were the total costs assigned to work in process? Quantity Price Total Direct Materials
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 33,000 $3.57 $117,711 Direct Labor 33,000 $16.00 $528,000 Overhead 33,000 $10.40 $343,200 $988,911 (j) If the overhead controllable variance was $3,000 favorable, what were the total variable over that the overhead controllable variance relates only to variable costs.) rhead costs incurred? (Assume...
View Full Document

Page1 / 2

P11-4A+j&k - 33,000 $3.57 $117,711 Direct Labor 33,000...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online