I got 30 out of 40 for 75%. This means I missed 5 questions. 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
1. Max Company has developed the following standards for one of its products. Direct materials: 15 pounds  ×  $16 per pound Direct labor: 4 hours  ×  $24 per hour Variable manufacturing overhead: 4 hours  ×  $14 per hour     The following activity occurred during the month of October:     Materials purchased: 10,000 pounds costing $170,000 Materials used: 7,200 pounds Units produced: 500 units Direct labor: 2,300 hours at $23.60/hour Actual variable manufacturing overhead: $30,000 The company records materials price variances at the time of purchase. The direct materials price variance is 1.  $50,000 favorable. 2.  $50,000 unfavorable. 3.  $10,000 unfavorable. 4.  $10,000 favorable. 2
Background image of page 2
2. Which of the following equations measures the total budget variance? 1.  AQ × (AP - SP) 2.  SP × (AQ - SQ) 3.  SQ × (AP - SP) 4.  (AQ × AP) - (SQ × SP) 3
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
3. Using more highly skilled direct laborers might affect which of the following variances? 1.  direct materials usage variance 2.  direct labor efficiency variance 3.  variable manufacturing overhead efficiency variance 4.  all of the above 4
Background image of page 4
Frekko Company collected the following information: Standard costs per unit:        Variable overhead 4 machine hours @ $6 per machine hour      Fixed overhead 4 machine hours @ $10 per machine hour     Actual output 20,000 units Denominator (normal capacity) output 21,000 units Actual machine hours 79,000 machine hours Actual variable overhead cost $540,000 Actual fixed overhead cost $810,000 Refer to Exhibit 9-10. Using the two variance method, what is the volume variance? 1. 
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/08/2011 for the course ACCT 360 taught by Professor N/a during the Fall '10 term at Mountain State.

Page1 / 21

Quiz_Week5 - I got 30 out of 40 for 75 This means I missed...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online